ST. LOUIS, Mo. (KMOX) — The Missouri Department of Transportation has postponed road construction that would have closed both directions of Route 21 at the Route 141 bridge Monday night.

MoDot’s contractor Krupp Construction says the delay is necessary because of pending storms this evening.

Route 21 was originally going to be closed beginning at 7 p.m. until 5 a.m. Tuesday.

Road crews were planning on removing section to the old driving surface on the Route 141 bridge.

The closure will be rescheduled at a later date.

Copyright KMOX Radio

Comments

Leave a Reply

Please log in using one of these methods to post your comment:

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

More From CBS St. Louis

Weather
Download The App

Listen Live